Go Back   Video Editing Forums: Digital Director > Video Editing: Software Problems and buying advice > Adobe Premiere, Premiere Elements, and After Effects

Adobe Premiere, Premiere Elements, and After Effects For users of Adobe Premiere 6.0, 6.5 and Premiere Pro. Post problems, tips and queries!

Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 08-30-2005, 04:45 PM
Junior Member
Windows Movie Maker
 
Join Date: Aug 2005
Location: Finland
Posts: 4
0 Videos nominated
Video Of the Month(s): 0
olluna
Default Editing a concert video from multiple sources

hi!

I hope the title makes sense, but here's the background;
I'm pretty rookie in editing(as in filming too,heh), and I got this commission to shoot this a little "lower budget" concert video. Well ahem, I studied concert videos, made "storyboards" and so on, then me and my mighty team shot the concert with 3 minidv-cameras, and... now it's time to edit it!
I have been given an powerful pc with adobe premier pro to my use, and... it's been years since I last edited with any of those premiers!>_<
so,

I have been reading the tutorial/s here and there, but what I'm really wondering, is how you should begin editing when you have the same material from three different sources? I mean, how is it possible? I'm at loss, so any tips&hints are appreciated, as tutorial links too I'm the studying type, thanks!
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old 08-30-2005, 05:29 PM
Marc Peters's Avatar
Administrator
 
Join Date: Nov 2003
Location: Kent
Posts: 8,659
0 Videos nominated
Video Of the Month(s): 0
Marc Peters has disabled reputation
Default

Premiere isn't the easiest of software to use in a multi-camera environment. The easiest way to do this in premiere is to start by synching up all the videos in 3 seperate layers. You can then "peel" away the layers to reveal the video underneath.

Start with what you consider to be your main cam in layer 3, then in layer 2 and 1 place the "cutaway" cams. When you want to cut to a second or third camera, simply razor video layer 1 (and perhaps 2) then move the new in point of the clip to reveal the clip underneath.

To see all 3 clips at once wilst you're doing this, drop one of the PIP presets onto each of the clips so that you end up with videos in seperate corners. You can then switch between the cams as above, then when your finished take out the PIP effect.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old 08-31-2005, 02:00 PM
Junior Member
Windows Movie Maker
 
Join Date: Aug 2005
Location: Finland
Posts: 4
0 Videos nominated
Video Of the Month(s): 0
olluna
Default

ah, thank you! This really helps! *until 5-minutes later: "um, I got his new problem..." * - just teasing^^
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old 08-31-2005, 02:01 PM
Marc Peters's Avatar
Administrator
 
Join Date: Nov 2003
Location: Kent
Posts: 8,659
0 Videos nominated
Video Of the Month(s): 0
Marc Peters has disabled reputation
Default

It's not a problem if we've got an answer
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old 09-02-2005, 03:50 PM
Junior Member
Standard Definition
 
Join Date: Sep 2005
Posts: 17
0 Videos nominated
Video Of the Month(s): 0
rendyka
Default

did you record the 3 cams at the same time and not pause the tape as long as the concert run ?? if you did this....it's more easier to edit.....
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old 09-03-2005, 10:51 AM
Senior Member
Video Editing Junkie
 
Join Date: Jul 2005
Location: Bladon
Posts: 1,383
0 Videos nominated
Video Of the Month(s): 0
LukeD
Default

yeh...the person above says it all...if you have run with out NO pause then you should be able to sync the time code and peel
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7 (permalink)  
Old 09-13-2005, 12:59 PM
Junior Member
Windows Movie Maker
 
Join Date: Aug 2005
Location: Finland
Posts: 4
0 Videos nominated
Video Of the Month(s): 0
olluna
Default

Originally Posted by rendyka
did you record the 3 cams at the same time and not pause the tape as long as the concert run ?? if you did this....it's more easier to edit.....
well, cough cough, the cameras didn't begin to record at the same time, but editing them to begin at the same time hasn't been that bad as I first imagined^^;
But I still haven't edited the last bands from the both days. Both of them had so much extra that we had to - yes -pause the recording at different times in order to change a new cassette, well, as long as it's not impossible

And of course I have a question to ask too.

I haven't really figured out how to fix it, but the third cam's video image size is smaller than of the two others-->720x480(!) ,while the others are 720x576. Could this have something to do with the third cam being a ntsc-standard camera? - uh, I remember just talking then about putting it to pal-mode. Do you have any idea how I could get all those videos to same size? I don't mind re-capturing or anything, since the project-files are the ones that matter, as long as this isn't something impossible - this seems to be my video editing motto "as long as it's not impossible"

In case someone wonders why on earth one of the cameras was a ntsc-camera(instead of 3 pal-cameras), well, just at the last minute we noticed that one of the cameras was a wrong kind of one - yeah, just my luck, but luckily one guy from a mexican band borrowed his cam to us^^b
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #8 (permalink)  
Old 09-13-2005, 04:58 PM
Marc Peters's Avatar
Administrator
 
Join Date: Nov 2003
Location: Kent
Posts: 8,659
0 Videos nominated
Video Of the Month(s): 0
Marc Peters has disabled reputation
Default

Not only is it a different frame size, it's also a different frame rate (30fps compared to the 25fps of the PAL cams). If I were you I'd convert the footage to PAL first.

Puremotion do a "cheap" PAL/NTSC convertor for £109 (I say cheap as you should see how much these things go up to!). Alternatively you could do it the poor mans way and import the footage into VirtualDub, then export as DV AVI (PAL) using frame rate reduction and resize filters.

Not ideal, but I've a feeling Premiere won't let you mix PAL and NTSC in one project.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Multiple cameras/editing tracks jbsandown Adobe Premiere, Premiere Elements, and After Effects 3 08-18-2006 02:26 PM
The Drunk Staind Concert Video huebe User Videos 0 02-23-2006 03:31 PM
a music concert video GillianG User Videos 3 09-13-2005 08:20 AM
good sources of reading for a beginner Astrix General Software Problems 2 07-29-2005 10:37 PM
audio/video out of sync .recording from different sources jahef General Software Problems 0 02-02-2004 01:59 AM

Branded 2 728x90


All times are GMT. The time now is 02:34 PM.